Framing, capture intervals and reliable power: the decisions to make before your project starts.
Start with the frame
Choose a viewpoint that remains useful throughout construction. Consider increasing building height, moving cranes and the path of the sun. Plan safe access for periodic maintenance.
Capture schedule and storage
Set the capture interval around the pace of activity and the project duration. Account for daily frame count, RAW file size and backups when planning storage. Final capacity is selected during the technical review.
Plan for every season
Long-term capture needs a plan for dust, rain and temperature changes. Power, housing, thermal control and maintenance work as one system.
Discuss your project ↗